Home | About ICEweb | Acronyms | Actuators | Alarm Management | Analysers | Books | Burner Management | Can Open | Charges | Control | Choke Valves | Control Valves | Condition & Machine Monitoring | Composite Valves | Coriolis Flow | Corrosion | Data Comms | Data Loggers | EX Web | Education | Electrical Web | Emission Monitoring| Employment | Enclosures | Fieldbus | Fire & Gas | Fittings | Flow | Forum | Foundation Fieldbus | Fuzzy Logic | HART | Hazardous Areas | Health and SafetyHeat Tracing & Bundles | HIPPS | Humidity | Hydraulics | ICEnews | Industrial Ethernet | Instrument | Instrument Enclosures,Sunshades & Supports | Instrument Valves & Access | Laser Instrumentation | Level | Links | Manufacturing and Automation Safety | Modbus | Motion Control | Multiphase Flow | New | Networks | News | New Technology | Oxygen Analysers | Oil in Water Analysers | Optical Fibre Instrumentation | PH Measurement| Profibus | Pressure | Pressure Regulators | Pressure Relief Valves | Register | Rupture Discs | Safety Instrumented Systems | Samplers | Sample Systems | Security | Severe Service Valves | Shutdown/ESD Valves | Simulators | Solenoids| Suppliers | Surge & Lightning | Technical Information | Terminals | Temperature | Test And Calibration | Tools | TubingUltrasonic Flow | Valveweb | V-Cone Flow | Wireless | Wish List | Contact ICEweb |

Whilst every effort is made to ensure technical accuracy of the information supplied on iceweb.com.au, Keyfleet Pty Ltd and its employees accept no liability for any loss or damage caused by error or omission from the data supplied. Users should make and rely on their own independent inquiries. By accessing the site users accept this condition. Should you note any error/omission or an article offends please do not ignore it, contact the webmaster and we will review, rectify and remove as necessary.

Instrumentation, Control, Fire & Gas and SIS Design Engineering

Instrument and Systems engineering, design, documentation and management for the entire plant lifecycle
AVEVA Instrumentation is a proven, feature-rich software suite for Instrumentation and Control engineering. Its advanced graphical user interfaces, extensive use of design rules and catalogues for data creation, and maximum workflow flexibility make AVEVA Instrumentation the preferred choice for projects of all sizes. Stand-alone or fully integrated, AVEVA Instrumentation is functionally rich, both for the Engineering Contractors in design and for the Owner Operator in everyday plant operations. When used as part of an integrated AVEVA software deployment, it adds instrumentation data into the complete project information model, exposing it to the full range of AVEVA’s design, engineering, collaboration and lifecycle management technologies.

A good instrumentation design requires the production of a large number of design drawings and other documentation, usually in conjunction with some kind of Instrument Database such as AVEVA Instrumentation. A list of the more usual ones is detailed below;

DESIGN DOCUMENTS

Instrument Design 

Instrument Index

An Instrument Index is a super starting point for any design, it is really a database of all the necessary references which are required in an instrument design, all referenced from the tag number. It would include fields such as Tag Number, Service, Line /Equipment No , Instrument Type, Location, Location Dwg, Cable Routing Diagram, Junction Box Layout Drawing, Manufacturer, Model, Calibration, Measuring, Size & Process Connection, P & ID Number, Process Datasheet Number , Instrumentation Datasheet Number, Hookup Drawings Number, Bill of Materials Number, Loop Diagram Number, Fieldbus Segment Drawing Number and Instrument Standard Number, Relevant Standard Numbers and Purchase Order Number. You will find that some "non instrument" people will say that it is an unnecessary document BUT THIS IS NOT TRUE! 

The following link shows a Typical Instrument Index


Instrument Hook Ups

Instrument Hook Up Diagrams detail the accessory and tubing hookup for both process and pneumatic instruments based on the tag number. It should include standard specifications for the welding of hook-up piping,  heat tracing & insulation and pressure testing & painting requirements. Generally included are;


Instrument Pneumatic Hookup Diagrams

Typical Pneumatic Hookup


Process Hookup Diagrams

Typical Process Hookup 


Instrument Loop Diagrams

Instrument Loop Diagrams detail the instrument connection and wiring from the field instrument to the control system Input/Output (I/O) card. Included are termination box details, connections, wiring including screens etc.  A Typical Instrument Loop Diagram from Creative Engineers is shown on this link, however you will have to rotate it to show it in the correct orientation. 


Instrument Fieldbus Segment Diagrams

 Instrument Fieldbus Segment Diagrams are similar to Instrument Loop Diagrams, except they detail all the fieldbus field instruments along with their respective "spurs", terminators and the connection interface to the fieldbus trunk.

An Engineering & Construction Firm Tackles Foundation Fieldbus - Kvaerner Shares Experience With Designing Field-Based Control Architectures. - Andrew Houghton and David Hyde - Foundation fieldbus is quickly gaining acceptance in process automation and control. While initial fieldbus installations tended to be nervously watched trials and demonstrations running non-critical processes, more recent applications have successfully attacked mainstream controls projects. Houston-based Kvaerner’s experiences in recently completing the development of a major chemical plant application show that IEC 61158 Foundation fieldbus has definitely achieved prime-time status, not only for user-developed projects but also for confident acceptance by Engineering & Construction firms. To be successful, however, we found that E&C companies need to change their working practices and develop new procedures and tools to make the leap from conventional DCS techniques to the scalable, field-based automation architectures permitted by fieldbus. This paper shows the required design steps, along with a typical segment drawing - from Emerson Process Management.


Instrument Fieldbus Segment Checkers

There are several "free" tools which check the segment design.
- Emerson Process Management Segment Design Tool
- Pepperl+Fuchs Segment Checker
- Yokogawa Segment Checker
- MTL Segment Checker


Instrument Block Diagram 

The Instrument Block Diagram shows all the instruments in an overview format. 


Instrument Datasheet 

An Instrument Datasheet is the primary design Instrumentation purchase document, it details all the technical and process data required to select an instrument. 
SA-TR20.00.01-2006 Specification Forms in Microsoft Word Format - 3rd Edition - The 3rd edition of the ISA Specification Forms in Word Format on CD-ROM provides electronic forms that greatly aid the design, purchase, and manufacture of process measurement and control instrumentation. The 77 reusable forms, covering a wide range of instrumentation, include operating parameters, device specifications, general requirements, and more. Supplementary listings for each form provide ready guidance on entering data and units.


Instrumentation Design Tools and Databases  New Page!

Today, on small and large projects an Instrument Design Software tool is an essential part of completion of the design documentation detailed in the various line items on this Comprehensive page thanks to AVEVA Instrumentation. Just click on the link above to access information of all aspects of Instrumentation Design Documentation.


Instrument Cable Schedule

The Instrument Cable Schedule provides details of all the cables utilised, it typically lists type of cables, source, destination, terminal, size, core, length etc. 
Typical Cable Schedule


Instrument Specifications

Instrument Specifications are generally produced by the End User company or Engineering design Houses. They provide a detailed description of the design requirements.


Instrument Layout

The Instrument Layout details the location of the instrument and cable routes or pneumatic lines on a "plot plan". 


Instrument Air Supply Diagrams

  Instrument Air Supply diagrams show the various configurations of instrument air manifolds. 


Instrument Tubing/Cable Tray Support Layout / Detail

These drawings detail the tray layout, design of the tray and Material Take Off. 


Cable Penetration Layout

Details the penetrations into a panel, showing the cable transit frame and block configuration.


Process Control System Design

It is worthwhile considering the extensive use of a database system in the production of the design documents which are to be used as input documentation by the system supplier. 

Base Graphics

The generation of 'base graphics' MUST be configured by the operating company since a supplier just does not have the experience to produce graphics which accurately reflect the process. It is not simply a job of 'copying' the P&IDs. The most effective way of configuring these base graphics which the supplier enhances is to use the supplier configuration package, thus having the ability to transfer the data to the supplier database easily.

It is also a great idea to use a Database for creation of the Instrument Index , Cable data Sheets, I/O schedules, Message Lists and Motor Schedules as data can then be effectively transferred from one database to another. This does have the added advantage in that errors are minimised once one database has been checked. Mind you if adequate checking does not occur then the problem will be multiplied.

The following input documents should be produced for issue to the Process Control System (PCS) supplier. Some operators consider that it is more effective for the PCS suppliers to create some of these documents but that is just not so in that they just CANNOT have adequate experience to provide a comprehensive enough package.

(1) I/O SCHEDULES

 These are the base documents around which configuration revolves, information contained within it should include tag number, whether it is an Intrinsically safe or Non I.S. loop, digital or analogue, range, units, critical or non critical loop, report input and alarming priority.

(2) FUNCTIONAL LOGIC DIAGRAMS

These are the base documents which the supplier uses for motor and sequence control. They are usually drawn utilising logic blocks around the logic symbols which are identified in AS 1102.9 - 'Graphical Symbols for Electrotechnology - Part 9 Binary Logic Elements'.

(3) MESSAGE LISTS

 These lists are the base document which are used for the generation of reports, alarm and special messages. They are usually configured using a database format which the supplier can easily transfer to his own database.

(4) BASIC GRAPHICS

The rudimentary graphics which are initially passed to the operating company OPERATIONS GROUP for comment and then used by the supplier as the base graphic background which the supplier then enhances.

(5) CABLE DATA SHEETS

These sheets are used rather like termination diagrams where normal termination diagrams do not exist.

(6) MOTOR SCHEDULE 

This document details the requirements needed by the energy management system ie priority of tripping.

(7) TERMINATION DRAWINGS

Details of all incoming/outgoing terminations and cables.

(8) FUNCTIONAL DESIGN SPECIFICATION

This document specifies the functional and technical requirements of the system. It should be comprehensive and miss nothing. 'Slimline' specifications DO NOT work and leave the customer wide open for variations.

THE CONTROL AND INSTRUMENTATION 'TAIL END CHARLIE SYNDROME'

It has always been the case that the Controls/ Instrumentation design could not be finalised until the piping design has been completed because the instrument locations are unable to be adequately determined. This of course is true if total accuracy is required, however, if you have a schedule problem there is a method of achieving 90% accuracy at a very early stage, picking up the remaining 10 % at a later time.

This method utilises the base vessel layout and allocates instrument positions on a 'best guess' basis (usually they are very close to the final position) and 'driving' package vendor terminations at edge of skid. The suppliers we have found are not adverse to this approach as it does do a fair bit of design for them.

THE 'LOST' INTERNAL SYSTEM INSTRUMENT TAGS

It is always a problem as to just where you pick up internal system tags and tags which do not appear on the P&IDs. A convenient method of picking up these tags is to use a document called a Instrument Line Diagram. The ILD is essentially a point list and can be in diagrammatic or data format.

This document however must be treated with great care in that it can become a monster if you are not careful. Keep it as simple as possible, utilise it by all means as a tool for creating 'temporary P&IDs' when package P&IDs are not available but ensure that the tagging system used does not cause problems later.

INSRUMENT AND CONTROL DESIGN CHECKING

It is absolutely essential that all documents produced are cross checked, to not check is false economy as eventually the supplier will pick up errors and it takes significantly more effort at that time to rectify them. Considerable cost overruns can result from poor cross checking.


Safety Instrumented System Design Documents

The  utilises several documents to develop the necessary logic these being:-

SHUTDOWN PHILOSOPHY  

This is the most important document associated with the Combined Safety System in that it lays down the philosophy applicable to it. In this document are listed the hierarchical shutdowns. One must not lose sight of the fact that although the system has the ability to implement very critical shutdown features it also implements less critical unit and process Shutdowns.

For instance on offshore platforms the usual stages of shutdown are as follows:-

  1. UNIT SHUTDOWN - this, the lowest level of shutdown, causes the individual units to stop.

  2. PROCESS TRAIN SHUTDOWN - an individual Process Train will shutdown on occurrence of any applicable trip.

  3. PROCESS SHUTDOWN - on this occurrence the complete process stops but utilities remain running, in effect it is a process 'stop' with NO BLOWDOWN in order to facilitate a easier startup on rectification of the problem.

  4. EMERGENCY SHUTDOWN - This action results generally from fire or Gas being sensed on the platform, obviously a fire in the Galley or in a room in the accommodation does not cause a ESD but more serious events in the Process, Wellhead or other critical areas will result in an ESD. An ESD is actually a Process Shutdown with Blowdown and isolation of the platform trunkline. The blowdown results in flaring of the gas component of the platform inventory whilst the liquid component is maintained within the various process vessels. When co-incident fire detection in the process or wellhead areas occurs one of the two strategically placed firepumps start and deluge occurs automatically.

On some platforms main power is shutdown and the emergency generator starts when an ESD occurs whilst on others main power is maintained by the generators switching to Diesel except when there is fire in a critical area such as the wellheads. This approach is advocated in that maintaining lighting ensures that at night the firefighting crew can see what they are doing.

  1. TOTAL PLATFORM SHUTDOWN - This shutdown hopefully will never require operation during the life of the platform since it usually is the result of abandonment. There are generally only two or three TPSD pushbuttons which are under the control of the Platform Operations Manager. The result of this action is total blackout of the platform including isolation of batteries except for some navaids which continue to run. The intent of this shutdown is to maintain some battery power for when the 'black start team' reboard the platform.

Other documents used in the development of the CSS configuration are as follows:-

INPUT/OUTPUT (I/O) SCHEDULES

these detail the fundamental configuration such as tag number, IS or NIS, alarm limits, analogue ranges etc.

PSD/ESD CAUSE AND EFFECTS

These documents which are based on the Process Cause and Effects are used by the CSS supplier as the basis for the logic. The usual appearance of them is to have the cause on the left hand side with the effect at the top with a 'X' matrix.

FIRE AND GAS CAUSE AND EFFECTS

These documents are similar to the PSD/ESD C&E described above except that they do not have logic symbols incorporated (matrix only).

The logic is developed by the vendor based on the above documentation on the CSS CONFIGURATION PACKAGE. This package is deliberately separate from the executive software of the system since it is very important that software previously developed is not corrupted in any way. After completion the software is tested extensively before being included in the overall software package. Great emphasis is placed on ensuring that the executive software cannot be accessed by unauthorised personnel and once the system is operational the configuration package is usually located onshore.

MESSAGE LISTS/CABLE DATA SHEETS/ TERMINATION DRAWINGS

As previously described for PCS.

DESIGNING AND SPECIFYING A COMBINED SAFETY SYSTEM (CSS)

When designing and specifying a CSS it is important to remember that it does have a fundamental common mode failure point this being of course the software. It is all very well to have duplicated and triplicated hardware but if there is a common software bug just what can be done to overcome the problem. Well the answer is that the requirements of API RP14C should be followed in that there should be a primary and secondary safety system. Usually the primary being the electronic system and the secondary, safety relief valves.

Where there is no possible alternative to having a single electronic system then it is absolutely imperative that DUAL sets of software are used which have been written by DIFFERENT personnel. Having to use this route has great disadvantages in that it is very complex, extremely costly and difficult to maintain. The RULE is therefore - devise some form of secondary system.

Construction Engineering for Instrumentation - Dattatray Nikam - This is an excellent document which details the fundamentals for Instrumentation Construction Engineering.


General Process Design Documentation

PROCESS AND INSTRUMENTATION DIAGRAMS

How to read P&IDs - Dave Harrold - Instrumentation detail varies with the degree of design complexity. For example, simplified or conceptual designs, often called process flow diagrams, provide less detail than fully developed piping and instrumentation diagrams (P&IDs). Being able to understand instrumentation symbols appearing on diagrams means understanding ANSI/ISA's S5.1-1984 (R 1992) Instrumentation symbols and identification standard. S5.1 that defines how each symbol is constructed using graphical elements, alpha and numeric identification codes, abbreviations, function blocks, and connecting lines. Thanks to Control Engineering

Useful Instrument and Process Design Tools 

4.11 Reading a P&ID - This self-study workbook offers a concise course in how to read and understand Piping and Instrumentation Drawings (P&IDs). These drawings, also known as Process and Instrumentation Diagrams, or Process and Control Diagrams, are essential to many industrial operations. After completing the workbook you should be able to identify symbols and function labels commonly found on P&IDs, describe how system components are related, and trace process stream flow and control loop functions. Included are sample P&IDs, reference material explaining ISA symbology, answers to the problems, and a demonstration exercise that pulls together the skills taught in the course. The workbook, which has been reviewed for compliance with ISA standards and practices, covers the following subjects: Information on a typical P&ID, master sheets, symbols, instruments, line designations, tracing process flow, and controlling process operations.

4.11 Control System Documentation: Applying Symbols and Identification, 2nd Edition - This ISA classic provides the symbols and identification commonly used throughout the process industries. It contains sample P&ID and numerous examples of symbols and tagging concepts. It also provides most of the symbols and identifiers that are unique to instrumentation and gives practical examples of their use. Documentation changes and the evolution of control systems engineering and design work over the past decade are included in this edition. It is the intent of the authors to help people communicate ideas and concepts through the use of symbols and identifiers. Ideal for engineers, managers, sales people, technicians, and students, this book will improve and strengthen communications among not only instrumentation specialists, but all interested professionals.

1.12 Human Factors Engineering (HFE) in Projects - This excellent 84 page Recommended Practice (RP) is an essential design document for anyone involved in the design of facilities. Just have a look at the examples in it!  It adopts a practical, cost-effective and balanced approach to applying HFE on oil & gas projects. It recognises that many HFE issues can be controlled simply by ensuring compliance with existing technical standards. However, there are times where there is a gap between what can be specified in technical standards and the design features needed to support efficient, reliable and safe human performance. This RP involves three elements for controlling HFE-related risk: (1) Compliance with relevant technical specifications (2) HFE specific design analysis and design validation and (3) Organisation and competence to deliver appropriate standards of HFE quality control. Compliance with this RP should normally satisfy requirements from national regulators for evidence that HFE has been adequately considered in design. The process allows projects to demonstrate that consideration has been given to reducing the HFE risks and the potential for human error to a level that can be shown to be As Low As Reasonably Practicable (ALARP) through engineering and design - from International Association of Oil & Gas Producers.


Project Management

Make or Break with Project Management - Bill Lydon - Project management is critical to ensuring projects are implemented correctly, on time and within budget. Good project management also communicates to your management or stakeholder that you are a professional. These are thoughts from my experience managing many projects and consulting to clients on projects. The most valuable lessons were learned when taking over projects that were in serious trouble - from Automation.com

Walking the Fine Line - Scott Sommer and Christopher Russell - Systems integration is tough work. Often we implement someone else’s design to the complete satisfaction of the owner.  Every project produces a list of lessons; the challenge after completing the project is to learn from those lessons and avoid repeating the same mistakes. We have compiled 25 lessons in hopes that systems integrators, end users, and managers alike will not only gain respect for the role of systems integration in industrial project execution, but also avoid pitfalls and errors that keep a good project from becoming an excellent one - from ISA and InTech

Communicate: Avoid Assumptions like the Plague - Michael Whitt - There are certain design tasks and group interactions key to the development of a computerized process control system. Systems integration (SI) represents a vast category in that development, and it includes software development, data communications, and operability issues - from ISA and InTech.


6.11 General Instrument and Control Engineering Tips

The following articles are contained in IDCs Steve Mackays "Little Red" book which is not so little at 160 pages. There are some really useful tips to be found here. This pdf is worth putting on your computer for reading on those long trips. You can get it for free here.
Be foolish more often in engineering Don’t spend another penny on formal training  Fearsomely outstanding engineering presentations Engineering innocence
Is there anything left for us to do? Where have all our engineers and technicians gone? Roadshow through the Outback The Great Move
Fingertip engineering knowledge Have we forgotten the important aspect of our business  Excellence in Australian engineering

Why our engineering education system is broken and what to do about it 

Woz – What an inspiring engineer Real time engineering collaboration Giving it all away – or retirement from engineering  Tethered to your desk and smothered by your work – whilst mobile
Safety – different countries/different standards or not? Invest in your people before you lose ‘em As an engineering professional – what are you really worth? Where on earth has the electronics (or indeed, plain old) hobbyist gone to?
Where have all our engineering leaders gone? The (erratically) mobile engineer In the thrall of politicians

Putting your engineering brain into overdrive – with guaranteed improvements

Trust your guts and not always your engineering brain Nuclear power: to hell? Or maybe, just maybe … heavenly bliss What on earth do you expect the world to do with your rubbish? One of education’s greatest confidence tricks – lectures

Making up for the problem solving toolbox defect in our formal engineering education

How many of us are guilty of negligent engineering and potential disasters?

Don’t communicate with a battering ram or a twisted whisper, but with engineering panache!

Don’t despise engineering advice from so-called simpletons
Accountants are killjoys and engineers over-engineer Why nanotechnology is important to engineers Are we tilting at windmills with solar or wind energy The myth of bottling your techie’s know-how before they leave
How to avoid engineering career killers – 11 tips Can we make engineering safety standards work? Welcome to another brilliant year Engineering and the ‘long tail’ distribution
Testing engineering systems: but only perfunctorily

Power travails of Africa or Don’t let your politician walk over you

Common sense with safety is not so common around here A sure-fire way to electrocution and immediate sacking
Why is battery technology so slow in growing up?

Hard-won experience makes you master of the engineering universe

Innovation in engineering using (mainly) the KISS principle Engineering multi-skilling in your part of the universe

Invisible engineers and technicians – undervalued, disappearing and needing your support

Engineering conference papers for you

Originally from the Wild West, we engineers now need to be attuned to style and culture

Grasp the engineering nettle in biology and medicine
Beat a gadget-strewn path to your local geek fair Collaborate in creating your next engineering project

Freely-available know-how and our Automation and conversions guides

Engineering cloud computing
Your list of favourite engineering videos What’s better? Real engineering or styling and marketing?

We all need an engineering mentor (or advisor, teacher, role model, friend)

Does management know how to retain engineering professionals?

Fossil fuels are almost done for

Safety Design of Offshore Installations

11.11 Technical safety - This NORSOK standard describes the principles and requirements for the development of the safety design of offshore installations for production of oil and gas. Where applicable, this NORSOK standard may also be used for mobile offshore drilling units. This NORSOK standard, together with ISO 13702, defines the required standard for implementation of technologies and emergency preparedness to establish and maintain an adequate level of safety for personnel, environment and material assets.


Electrical, Instrumentation and Telecommunication Installation

11.11 Electrical, Instrumentation and Telecommunication Installation - This Offshore Petroleum NORSOK standard covers functional and technical requirement related to installation of electrical, instrumentation and telecommunication equipment. In addition the standard establish basis for engineering of typical areas like cable segregation, cable requirements, Ex-philosophies, equipment enclosures etc.