Home | About ICEweb | Acronyms | Actuators | Alarm Management | Analysers | Books | Burner Management | Can Open | Charges | Control | Choke Valves | Control Valves | Condition & Machine Monitoring | Composite Valves | Coriolis Flow | Corrosion | Data Comms | Data Loggers | EX Web | Education | Electrical Web | Emission Monitoring| Employment | Enclosures | Fieldbus | Fire & Gas | Fittings | Flow | Forum | Foundation Fieldbus | Fuzzy Logic | HART | Hazardous Areas | Health and SafetyHeat Tracing & Bundles | HIPPS | Humidity | Hydraulics | ICEnews | Industrial Ethernet | Instrument | Instrument Enclosures,Sunshades & Supports | Instrument Valves & Access | Laser Instrumentation | Level | Links | Manufacturing and Automation Safety | Modbus | Motion Control | Multiphase Flow | New | Networks | News | New Technology | Oxygen Analysers | Oil in Water Analysers | Optical Fibre Instrumentation | PH Measurement| Profibus | Pressure | Pressure Regulators | Pressure Relief Valves | Register | Rupture Discs | Safety Instrumented Systems | Samplers | Sample Systems | Security | Severe Service Valves | Shutdown/ESD Valves | Simulators | Solenoids| Suppliers | Surge & Lightning | Technical Information | Terminals | Temperature | Test And Calibration | Tools | TubingUltrasonic Flow | Valveweb | V-Cone Flow | Wireless | Wish List | Contact ICEweb |

Whilst every effort is made to ensure technical accuracy of the information supplied on iceweb.com.au, Keyfleet Pty Ltd and its employees accept no liability for any loss or damage caused by error or omission from the data supplied. Users should make and rely on their own independent inquiries. By accessing the site users accept this condition. Should you note any error/omission or an article offends please do not ignore it, contact the webmaster and we will review, rectify and remove as necessary.

Get seen by the people who use your products!
THIS SPACE
can be yours

This is a cached page from INX.Inc,  ICEweb cannot find the original pages on the web and felt that the information was too useful to be not available.  Should you know of a contact for the originator please advise by emailINX.INC

Most projects fail because preliminary engineering was not done!

Here are the first steps to success!

CLEARLY DEFINED REQUIREMENTS.

The PRELIMINARY ENGINEERING PROPOSAL PRESENTED BY:

INX.INC

Preliminary engineering consists of three parts:

  1. Define the process by generating an ISA standard P&I diagram of all necessary equipment. This documentation will then be used as the media for defining the control system. It will be used to develop the required scope of work.

  2. Meet with operations and maintenance personnel to create an outline of the sequence of operation. This would include any accommodations necessary to support existing equipment that would be integrated into the new modernized control scheme.

  3. Create a detailed specification that includes the systems architecture and controls hardware necessary to accomplish the control and operating configuration defined by parts 1 and 2.

PRELIMINARY ENGINEERING DETAILED SCOPE OF WORK